“Turning over a massive soundstage between productions is a huge job, but commercialcleaning.today does it quickly and efficiently. They clean up everything from set construction dust to craft services trash, providing top-tier production facility cleaning in the Central Florida area.”
Commercial cleaning service
Post-Construction Cleaning in Florida
Post-construction cleaning is phased cleaning of a newly built or renovated commercial space: a rough clean after major trades, a final clean once finishes are complete, and a touch-up immediately before handover. It focuses on construction dust, adhesive and label residue, protective film removal, and finish protection, and it requires filtration and methods ordinary janitorial work does not use.
Three phases, and why skipping one costs money
Rough clean happens after framing, drywall, and mechanical trades: bulk debris removal, sweeping, and getting the space workable for finishing trades. Final clean happens after finishes are in: every surface, top to bottom, including inside cabinetry, light fixtures, vents, and window tracks. Touch-up happens right before handover, because a space cleaned a week before turnover is not clean on turnover day.
The failure mode is a single 'construction clean' booked at the end. Fine drywall dust settles for days after disturbance, so one pass leaves the space dusty within twenty-four hours and the tenant's first impression is of a dirty new building.
Construction dust is not ordinary dust
Drywall and concrete dust is fine, abrasive, and electrostatic. Sweeping it airborne redistributes it across every surface in the building including into the HVAC system. It is removed with HEPA-filtered vacuums and damp methods, working top-down, with the HVAC handled carefully — running a system with construction dust in it pushes the problem into every duct in the building.
Abrasiveness is the other issue. Concrete and drywall dust ground under foot traffic scratches new floor finishes permanently in the first week. Getting it off the floor before the space is occupied is the difference between a floor that looks new for five years and one that looks worn in six months.
Residue, film, and the details that fail handover
The items that actually get flagged at handover walkthroughs are consistent: adhesive and label residue on glass and appliances, protective film left in window and door tracks, paint overspray and drywall compound spots, fingerprints on stainless and glass, dust in light fixtures and vents, and window tracks and sills full of debris.
A proper final clean works through those explicitly. Removing a manufacturer's sticker without leaving residue on glass, or clearing a window track completely, are small jobs that decide whether a walkthrough produces a punch list.
Handover and the first recurring visit
We hand over with photographs and a completed scope so the general contractor, owner, or tenant has documentation. Where we also take the recurring contract, the first visits are scoped heavier than steady state, because a new building keeps releasing settled dust for several weeks after occupancy.
What clients say
Scope checklist
Compare this line by line against any other bid you receive.
Rough clean
- Bulk debris removal
- Sweep and shop-vac throughout
- Clear window and door openings
- Remove trade waste to designated area
Final clean
- HEPA vacuum all surfaces, top to bottom
- Light fixtures, diffusers, and vent covers
- Cabinetry and casework, inside and out
- Adhesive, label, and protective film removal
- Paint overspray and compound spot removal
- Window tracks, sills, glass, and frames
- Restroom fixtures, tile, and grout
- Floors: appropriate first clean and finish protection
Touch-up before handover
- Re-dust all horizontal surfaces
- Glass and stainless fingerprints
- Floors re-cleaned
- Final photographs and walkthrough
What drives the price
We quote after a walkthrough. These are the factors that move the number — we do not publish invented per-square-foot rates.
- Square footage and number of rooms or units
- Build type — ground-up, full fit-out, or partial renovation
- Number of phases contracted
- Finish types and how delicate they are
- Deadline pressure and whether trades are still working in the space
Questions
Post-Construction Cleaning FAQs
- What is the difference between a rough clean and a final clean?
- A rough clean removes debris and makes the space workable for finishing trades. A final clean makes it ready for people — every surface, fixture, track, and floor, with dust control. They are not substitutes.
- Why does the space get dusty again after cleaning?
- Fine drywall and concrete dust settles for days after being disturbed. That is exactly why a touch-up clean immediately before handover is part of the scope rather than an upsell.
- Do you remove protective film and stickers?
- Yes, from glass, fixtures, appliances, and hardware, including the adhesive residue underneath, which is the part that usually gets left.
- Can you clean while trades are still working?
- We can, but expect to re-clean. It is usually cheaper to sequence properly: rough clean, trades finish, final clean, touch-up.
- Do you protect new floor finishes?
- Yes. Correct first-clean products for the specific finish, and where required a sealer or finish application before traffic. Grinding construction grit into a new floor in week one is permanent.
Keep going
Related pages
Get this scoped for your building
Walkthroughs across Florida, with a written scope you can compare against any other bid. Call or text (813) 738-4220.